| Currency | Code | ABR | Rate | Exchange Rate |
| Albanian lek | 008 | ALL | 10 | 1.8528 |
| Armenian Dram | 051 | AMD | 10 | 0.4342 |
| Australian Dollar | 036 | AUD | 1 | 11.8578 |
| Azerbaijanian Manat | 944 | AZN | 1 | 10.3259 |
| Belarussian Ruble | 933 | BYN | 1 | 5.4953 |
| Bulgarian Lev | 975 | BGN | 1 | 9.8535 |
| Canadian Dollar | 124 | CAD | 1 | 13.1570 |
| Chinese yuan renminbi | 156 | CNY | 1 | 2.4565 |
| Czech Koruna | 203 | CZK | 1 | 0.7869 |
| Danish Krone | 208 | DKK | 1 | 2.5843 |
| Euro | 978 | EUR | 1 | 19.2698 |
| Georgian Lar | 981 | GEL | 1 | 6.5375 |
| Hong Kong dollar | 344 | HKD | 1 | 2.2471 |
| Hungarian Forint | 348 | HUF | 100 | 5.0279 |
| Iceland Krona | 352 | ISK | 10 | 1.2820 |
| Indian rupee | 356 | INR | 10 | 2.1076 |
| Japanese Yen | 392 | JPY | 100 | 12.2957 |
| Kazakhstan Tenge | 398 | KZT | 10 | 0.3821 |
| Kuwaiti Dinar | 414 | KWD | 1 | 57.0799 |
| Kyrgyzstan Som | 417 | KGS | 10 | 1.9708 |
| Macedonian denar | 807 | MKD | 10 | 3.1310 |
| Malaysian Ringgit | 458 | MYR | 1 | 3.7709 |
| New Zealand Dollar | 554 | NZD | 1 | 10.9943 |
| Norwegian Krone | 578 | NOK | 1 | 1.7038 |
| Polish Zloty | 985 | PLN | 1 | 4.4376 |
| Pound Sterling | 826 | GBP | 1 | 22.2272 |
| Romanian Leu | 946 | RON | 1 | 3.8776 |
| Russian Ruble | 643 | RUB | 1 | 0.1902 |
| Serbian Dinar | 941 | RSD | 100 | 16.4447 |
| Shekel Israelit | 376 | ILS | 1 | 4.8598 |
| South Korean won | 410 | KRW | 100 | 1.3448 |
| Special Drawing Rights | 960 | XDR | 1 | 23.5016 |
| Swedish Krona | 752 | SEK | 1 | 1.7337 |
| Swiss Franc | 756 | CHF | 1 | 20.4253 |
| Tajikistan Somoni | 972 | TJS | 1 | 1.6055 |
| Turkish Lira | 949 | TRY | 1 | 0.6020 |
| Turkmenistan Manat | 934 | TMT | 1 | 5.0147 |
| U.A.E. Dirham | 784 | AED | 1 | 4.7790 |
| US Dollar | 840 | USD | 1 | 17.5515 |
| Ukraine Hryvnia | 980 | UAH | 1 | 0.4667 |
| Uzbekistan Sum | 860 | UZS | 100 | 0.1417 |
Construction work on the new waste transfer station with a sorting line in the Ciocana district has reached approximately 60% completion. The project is being carried out as part of the municipal initiative “Chisinau Solid Waste,” according to IPN.
Currently, the buildings that will serve the complex have been completed, including the administrative building, the sorting station hall, the transfer station, the car wash, and the repair shop. In addition, weigh stations for fire trucks, fire protection tanks, and utility networks are being constructed.
Once the sorting facility is completed, the modern sorting line—which has already been manufactured and is ready for transport to Chisinau—will be installed. This will enable the separation of recyclable materials and increase the capacity for sorting and recycling municipal waste.
The capital city’s municipal government states that the new transfer station, equipped with a waste sorting line, is one of the most significant investments in municipal waste management infrastructure ever made in Chisinau.
The investment for this phase of the project exceeds 8 million euros. The “Chisinau Solid Waste” project, with a total value of approximately 26 million euros, is financed by the Chisinau City Hall, the EBRD, the EIB through the Ministry of Finance, and the E5P Fund.