Minister: We procured energy from Romania. We will know the price at the end of the month

The price of emergency electricity procured from Romania is much higher than the price of regular energy, but this purchase was necessary to avoid disconnections. This is stated by the Minister of Energy, Dorin Junghietu, who explained that due to bombings on the Ukrainian energy system, Chisinau was forced to procure emergency energy from Romania. The Minister emphasized that the price will only be known at the end of the month, reports IPN.

Dorin Junghietu explained that over the weekend, in order to maintain system stability and avoid power outages, Chisinau was forced to resort to emergency imports.

“With the synchronization of the energy system of the Republic of Moldova and Ukraine into a common block, our energy system is balanced by Ukraine. On Friday night and Saturday morning, there were massive attacks on the Ukrainian energy system, production capacities, distribution and transport systems were affected. In order to maintain stability and to avoid interruptions, we had to take emergency electricity from Romania, for three hours. We are talking about 270 MW”, said the minister during the “În Context” show on the public television station.

The Minister emphasized that emergency electricity is considerably more expensive than the usual one. “We will only know the price of emergency energy at the end of the month, but it is usually much more expensive. It can even reach a price of 300-400 euros per MW”, explained the Minister of Energy.

At the same time, Dorin Junghietu appealed to the population for a rational consumption of energy, especially during peak hours. According to him, with the onset of the cold season, the consumption of electrical energy has increased considerably.

“I appeal for a rational use of energy, especially during peak hours, when consumption is at its highest. Now, with the onset of the cold season, the consumption curve has significantly changed. If during the summer the peak consumption started at 6 PM until 11 PM, now we observe a consumption of over 700 MW starting from 9 AM. The highest energy consumption is located in the Chisinau region”, stated Dorin Junghietu.



Musicians Timur Panteleev (vocals, guitar) and Alexandr Obîdennik (violin) are organizing a concert dedicated to the memory of Vladimir Vysotsky “Of course, I will return…” /State Russian Drama Theater “A.P. Chekhov” /at 03:00 PM/; at 06:00 PM/.

The audience is invited to the film “A Safe Place” presented at the Transylvania International Film Festival, sixth edition /Cineplex Loteanu /at 03:00 PM/.

The film “Yellow Tie” is presented at the Transylvania International Film Festival, 6th edition /Cinema Odeon /at 03:00 PM/.

Seniors from the capital are invited to a new edition of musical shows, held within the framework of the socio-cultural weekend project “Dialogue between generations” (July 25-26) /Public Garden “Stefan cel Mare si Sfant” /at 04:00 PM/.

The film “The Living” is presented at the Transylvania International Film Festival, 6th edition /Cineplex Loteanu /at 05:30 PM/.

The film “On Our Own” is being presented at the Transylvania International Film Festival, 6th edition /Odeon Cinema /at 05:45 PM/.

The Ciocana Sector Prefecture is organizing a new open-air dance evening /Ciocana Sector Amphitheater /at 06:00 PM/.

The film “Comatogen” directed by Igor Cobileanski is presented /Radical Theater /at 07:00 PM/.

A concert is taking place outdoors featuring Marcel Lazar – piano, Constantin Borodin – cello, and Ion Mosneaga – violin /Nicolae Donici’s Manor in Dubasarii Vechi /at 07:00 PM/.

The film “Green Wave” is presented at the Transylvania International Film Festival, 6th edition /Cineplex Loteanu /at 07:30 PM/.

Romanian short films are presented at the Transylvania International Film Festival, 6th edition /Artcor /at 08:00 PM/.

The film “Diary of a Chambermaid” is presented at the Transylvania International Film Festival, 6th edition /Odeon Cinema /at 08:00 PM/.

The immersive exhibition continues, inspired by the mythology and mystical folklore of the Republic of Moldova, “The Forest”, created by Milen Chelea /Plai Gallery /July 23-August 6/.

The exhibition “Urban Archeology and the Hidden Memory of Chisinau” continues /National Museum of History of Moldova /July 17-November 30/.

The contemporary art exhibition-competition continues: The municipal salon within the “Te salut, Chisinau!” Festival, the VI edition, dedicated to the 590th anniversary of the city /Constantin Brancusi Exhibition Center /July 8-26/.

The documentary exhibition “Echo from the past, for present and future” continues, dedicated to the memory of the victims of Stalinist deportations and one of the most tragic episodes in the history of Bessarabia /BNRM /July 3-August 3/.

The exhibition “The Thread of Identity! The traditional Romanian costume in book illustrations made by plastic artists from the Republic of Moldova” continues /BNRM /June 25-August 15/.

The graphic exhibition by Lica Sainciuc continues, opened as part of the Creative Industries Festival /Lutnita Gallery /June 5 – July 31/.

0 FacebookTwitterPinterestEmail


Minister: We procured energy from Romania. We will know the price at the end of the month

The price of emergency electricity procured from Romania is much higher than the price of regular energy, but this purchase was necessary to avoid disconnections. This is stated by the Minister of Energy, Dorin Junghietu, who explained that due to bombings on the Ukrainian energy system, Chisinau was forced to procure emergency energy from Romania. The Minister emphasized that the price will only be known at the end of the month, reports IPN.

Dorin Junghietu explained that over the weekend, in order to maintain system stability and avoid power outages, Chisinau was forced to resort to emergency imports.

“With the synchronization of the energy system of the Republic of Moldova and Ukraine into a common block, our energy system is balanced by Ukraine. On Friday night and Saturday morning, there were massive attacks on the Ukrainian energy system, production capacities, distribution and transport systems were affected. In order to maintain stability and to avoid interruptions, we had to take emergency electricity from Romania, for three hours. We are talking about 270 MW”, said the minister during the “În Context” show on the public television station.

The Minister emphasized that emergency electricity is considerably more expensive than the usual one. “We will only know the price of emergency energy at the end of the month, but it is usually much more expensive. It can even reach a price of 300-400 euros per MW”, explained the Minister of Energy.

At the same time, Dorin Junghietu appealed to the population for a rational consumption of energy, especially during peak hours. According to him, with the onset of the cold season, the consumption of electrical energy has increased considerably.

“I appeal for a rational use of energy, especially during peak hours, when consumption is at its highest. Now, with the onset of the cold season, the consumption curve has significantly changed. If during the summer the peak consumption started at 6 PM until 11 PM, now we observe a consumption of over 700 MW starting from 9 AM. The highest energy consumption is located in the Chisinau region”, stated Dorin Junghietu.


The “Eugen Doga” International Airport in Chisinau has launched a public tender for the current repair and maintenance of the asphalt concrete surfaces of the aerodrome platform. The estimated value of the contract is 67.2 million lei, excluding VAT, reports IPN.

According to the announcement published on the public procurement platform, bids can be submitted during the period of August 3-17, after the clarification request stage has ended, which will take place until August 3.

According to the technical documentation, a large part of the investment is intended for the repair of platform no. 1, where the aircraft parking spots are located. The verified estimate for these works is approximately 55 million lei, including VAT.

The repairs are not limited to the area where the aircraft are stationed, but also target the infrastructure used daily by airport services. Thus, the repairs also include the connection area between the control point and the aerodrome platform, the parking area designated for airport vehicles, the area where the workshops and material depots are located, as well as the area of the fuel supply station. At the same time, work will also be carried out on the access road to the passenger terminal.

The specification book indicates that the need for interventions was identified following technical inspections. The documentation further stipulates that the interventions will be carried out in operational areas and with restricted access, without affecting the airport’s activity.

0 FacebookTwitterPinterestEmail




1 IANUARIE, 2025
1 IANUARIE, 2025