The local public authorities of the first and second levels and those of the Autonomous Territorial Unit of Gagauzia will be empowered to take decisions regarding the building of monuments on owned land. However, the decisions can only be taken after the Ministry of Culture formulates a positive opi...
Government’s approval to build monument at local level no longer required
-
Acest conţinut este disponibil doar pe bază de abonament plătit.Vă rugăm să accesați compartimentul ABONARE