Three streets in Chisinau to be closed to traffic until September 30

The Chisinau streets Mitropolit Dosoftei, the section between the streets Mihai Viteazu and Henri Coanda, and Henri Coanda, the section between Dosoftei and Calea Iesilor streets, will be inaccessible to traffic between August 3 and September 30, IPN reports.

The section of Ion Creanga St between the streets Henri Coanda and Bucuriei will be narrowed partially. The traffic restrictions were imposed in connection with repair works on heat pipes.

The National Patrolling Inspectorate calls on the drivers to move with maximum attention, to bypass those road portions and travel on the adjoining streets and to obey the road signs placed in the area.

Вы используете модуль ADS Blocker .
IPN поддерживается от рекламы.
Поддержи свободную прессу!
Некоторые функции могут быть заблокированы, отключите модуль ADS Blocker .
Спасибо за понимание!
Команда IPN.