﻿<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Terminal Archives - ipn.md</title>
	<atom:link href="https://ipn.md/en/tag/terminal-en/feed/" rel="self" type="application/rss+xml" />
	<link>https://ipn.md/en/tag/terminal-en/</link>
	<description>Agenţie de presă independentă</description>
	<lastBuildDate>Mon, 11 May 2026 13:02:30 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://ipn.md/wp-content/uploads/2026/05/favico192x192.png</url>
	<title>Terminal Archives - ipn.md</title>
	<link>https://ipn.md/en/tag/terminal-en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Chisinau Airport relaunches the tender for the reconstruction of the passenger terminal</title>
		<link>https://ipn.md/en/chisinau-airport-relaunches-the-tender-for-the-reconstruction-of-the-passenger-terminal/</link>
		
		<dc:creator><![CDATA[Laura Chetrari]]></dc:creator>
		<pubDate>Mon, 11 May 2026 12:57:50 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[auction]]></category>
		<category><![CDATA[chisinau airport]]></category>
		<category><![CDATA[Modernization]]></category>
		<category><![CDATA[Relaunch]]></category>
		<category><![CDATA[Terminal]]></category>
		<guid isPermaLink="false">https://ipn.md/chisinau-airport-relaunches-the-tender-for-the-reconstruction-of-the-passenger-terminal/</guid>

					<description><![CDATA[<p>The public auction for the reconstruction of the passenger terminal at the &#8220;Eugen Doga&#8221; Chisinau International Airport has been relaunched. The project aims to modernize the infrastructure and expand existing&#8230;</p>
<p>The post <a href="https://ipn.md/en/chisinau-airport-relaunches-the-tender-for-the-reconstruction-of-the-passenger-terminal/">Chisinau Airport relaunches the tender for the reconstruction of the passenger terminal</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The public auction for the reconstruction of the passenger terminal at the &#8220;Eugen Doga&#8221; Chisinau International Airport has been relaunched. The project aims to modernize the infrastructure and expand existing spaces, to cope with the ever-increasing number of travelers, reports IPN.</p>

<p class="wp-block-paragraph">The airport administration announces that the works include the partial replanning of the building and its adaptation to the current air traffic requirements. Interested economic operators are invited to participate in the public procurement procedure.</p>

<p class="wp-block-paragraph">The project will be fully funded from the company&#8217;s own revenues. The works will take place in several stages, so as not to affect the operational activity. Details about the participation conditions are published on the public procurement platform.</p>

<p class="wp-block-paragraph">The auction for the terminal expansion was canceled at the beginning of the year due to issues with the technical documentation. The airport administrator, Sergiu Spoială, <a href="https://ipn.md/en/aic-administration-on-the-cancellation-of-the-auction-targeting-the-new-terminal-there-were-technical-gaps/">stated</a> at the time that the project required a complete review, as it lacked details such as design solutions, equipment, and passenger flows.</p>
<p>The post <a href="https://ipn.md/en/chisinau-airport-relaunches-the-tender-for-the-reconstruction-of-the-passenger-terminal/">Chisinau Airport relaunches the tender for the reconstruction of the passenger terminal</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>AIC Administration, on the cancellation of the auction targeting the new terminal: There were t</title>
		<link>https://ipn.md/en/aic-administration-on-the-cancellation-of-the-auction-targeting-the-new-terminal-there-were-technical-gaps/</link>
		
		<dc:creator><![CDATA[Iana Josu]]></dc:creator>
		<pubDate>Fri, 30 Jan 2026 04:30:00 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[Society]]></category>
		<category><![CDATA[airport]]></category>
		<category><![CDATA[auction]]></category>
		<category><![CDATA[cancellation of auction]]></category>
		<category><![CDATA[Modernization]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Terminal]]></category>
		<guid isPermaLink="false">https://ipn.md/?p=255851</guid>

					<description><![CDATA[<p>The auction for the reconstruction and expansion of the terminal of the Chișinău International Airport &#8220;Eugen Doga&#8221; was canceled after ambiguities and gaps were identified in the project documentation during&#8230;</p>
<p>The post <a href="https://ipn.md/en/aic-administration-on-the-cancellation-of-the-auction-targeting-the-new-terminal-there-were-technical-gaps/">AIC Administration, on the cancellation of the auction targeting the new terminal: There were t</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The auction for the reconstruction and expansion of the terminal of the Chișinău International Airport &#8220;Eugen Doga&#8221; was canceled after ambiguities and gaps were identified in the project documentation during the evaluation process. The airport administration clarified to IPN that the decision has nothing to do with the financial offers submitted, but with the need to revise the technical and architectural solutions, so that the project meets operational requirements and European standards.</p>

<p class="wp-block-paragraph">The Airport Administrator, Sergiu Spoială, explains that optimizing the documentation involves a complete review of the project, not a simple formal adjustment. &#8220;It&#8217;s not about simply reducing the volume of work, but about adjusting and supplementing the technical, architectural and engineering solutions, including detailing the equipment, materials, passenger flows, and critical functional areas,&#8221; specified the AIC director.</p>

<p class="wp-block-paragraph">According to him, the technical analysis highlighted several deficiencies, including the lack of clear design solutions, the absence of a final plan for the placement of equipment and engineering networks, as well as insufficient detailing of the technological furniture in the control areas. &#8220;These aspects resulted from the internal technical analysis of the documentation, carried out during the evaluation procedure, and imposed the need to revise the project before continuing the procurement procedure,&#8221; explains Sergiu Spoiala.</p>

<p class="wp-block-paragraph">The airport administrator further specifies that after the cancellation of the procurement procedure, the process of qualification and evaluation of the bidders was not completed, respectively, no disqualification decision was applied on technical, financial or administrative criteria. &#8220;The prices offered did not constitute a determining criterion at this stage. The cancellation decision was based exclusively on the need to adjust the project documentation,&#8221; he added.</p>

<p class="wp-block-paragraph">Sergiu Spoiala mentions that the estimated value of the contract will be determined after the completion of the project documentation review, and the new procurement procedure will be launched immediately after. The project is set to be implemented in stages, without affecting the current activity of the airport. &#8220;The main goal remains the safe and functional modernization, in accordance with European standards, even if this effort requires schedule adjustments to ensure the quality and sustainability of the investment,&#8221; says the AIC administrator.</p>

<p class="wp-block-paragraph">At the same time, the airport management reiterated that the passenger terminal modernization and expansion project will be fully funded from the airport&#8217;s own revenues, without involving public funds, and all decisions taken are exclusively in the public interest, safety, and long-term development of airport infrastructure.</p>
<p>The post <a href="https://ipn.md/en/aic-administration-on-the-cancellation-of-the-auction-targeting-the-new-terminal-there-were-technical-gaps/">AIC Administration, on the cancellation of the auction targeting the new terminal: There were t</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The new terminal of the Airport will cost 160 million lei, announces the head of the airport</title>
		<link>https://ipn.md/en/the-new-terminal-of-the-airport-will-cost-160-million-lei-announces-the-head-of-the-airport/</link>
		
		<dc:creator><![CDATA[Editor Editor]]></dc:creator>
		<pubDate>Tue, 23 Dec 2025 05:00:00 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[chisinau airport]]></category>
		<category><![CDATA[Passengers]]></category>
		<category><![CDATA[Project]]></category>
		<category><![CDATA[Terminal]]></category>
		<guid isPermaLink="false">https://ipn.md/the-new-terminal-of-the-airport-will-cost-160-million-lei-announces-the-head-of-the-airport/</guid>

					<description><![CDATA[<p>With the completion of the reconstruction project, Chisinau International Airport will increase its capacity, expected to handle up to 7.5 million passengers annually. This was stated by the airport manager,&#8230;</p>
<p>The post <a href="https://ipn.md/en/the-new-terminal-of-the-airport-will-cost-160-million-lei-announces-the-head-of-the-airport/">The new terminal of the Airport will cost 160 million lei, announces the head of the airport</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">With the completion of the reconstruction project, Chisinau International Airport will increase its capacity, expected to handle up to 7.5 million passengers annually. This was stated by the airport manager, Sergiu Spoială. According to the head of AIC, the money for the modernization of the Airport does not come from loans or external financing, which represents a performance for an investment of such magnitude.</p>

<p class="wp-block-paragraph">The Airport Administrator explained that the need for investments comes against the backdrop of historical records achieved in recent years.</p>

<p class="wp-block-paragraph">&#8220;In recent years, new records have been set at the Airport. Last year, we reached the record of 4 million passengers. This year, we hit the record of 5 million served passengers, and the year is not yet over. The figure will be higher,&#8221; said the head of Chisinau International Airport, Sergiu Spoiala, during the &#8220;Pe față&#8221; show on public television.</p>

<p class="wp-block-paragraph">According to Spoiala, the modernization of the Airport will initially target the expansion of the terminal and the modernization of operating equipment. &#8220;150-160 million lei will be spent to expand the terminal by 5,000 m2. Later, it will be about the modernization of all equipment, and the total amount required for these processes will be 800 million lei&#8221;, explained the Airport administrator.</p>

<p class="wp-block-paragraph">The head of AIC explained that, after the completion of the works, the airport will be able to serve significantly more passengers annually. Spoială specified that the project will be fully funded from AIC&#8217;s resources, without loans or external financial support.</p>

<p class="wp-block-paragraph">&#8220;With the completion of the reconstruction project, the Airport will increase its capacity by 1.5 million passengers. After the project is completed, the Airport will be able to handle 7.5 million passengers annually. The project is being carried out from its own sources. That is, the enterprise will not contract any credit and will not absorb external aid. All expenses will be borne from its own sources&#8221;, concluded Sergiu Spoiala.</p>
<p>The post <a href="https://ipn.md/en/the-new-terminal-of-the-airport-will-cost-160-million-lei-announces-the-head-of-the-airport/">The new terminal of the Airport will cost 160 million lei, announces the head of the airport</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Chisinau Airport launches the tender for terminal expansion</title>
		<link>https://ipn.md/en/chisinau-airport-launches-the-tender-for-terminal-expansion/</link>
		
		<dc:creator><![CDATA[Laura Chetrari]]></dc:creator>
		<pubDate>Mon, 03 Nov 2025 13:03:14 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[Important]]></category>
		<category><![CDATA[AIC Eugen Doga]]></category>
		<category><![CDATA[airport]]></category>
		<category><![CDATA[Auctions]]></category>
		<category><![CDATA[Expansion]]></category>
		<category><![CDATA[Terminal]]></category>
		<guid isPermaLink="false">https://ipn.md/chisinau-airport-launches-the-tender-for-terminal-expansion/</guid>

					<description><![CDATA[<p>The &#8220;Eugen Doga&#8221; Chisinau International Airport has launched a public tender for the reconstruction and expansion of the passenger terminal. The airport administration specifies that the project involves a partial&#8230;</p>
<p>The post <a href="https://ipn.md/en/chisinau-airport-launches-the-tender-for-terminal-expansion/">Chisinau Airport launches the tender for terminal expansion</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The &#8220;Eugen Doga&#8221; Chisinau International Airport has launched a public tender for the reconstruction and expansion of the passenger terminal. The airport administration specifies that the project involves a partial reconfiguration of the existing spaces and their expansion, to improve passenger comfort and flow, reports IPN.</p>

<p class="wp-block-paragraph">&#8220;The modernization project will be fully funded from the airport&#8217;s own revenues, and the works are planned to be carried out in stages, without affecting the current operational activity,&#8221; is mentioned in a press release.</p>

<p class="wp-block-paragraph">According to the published documents, the reconstruction works will be carried out within a period of up to 19 months, calculated from the date of signing the contract. Full details regarding the participation conditions are available on the <a href="https://achizitii.md/ro/public/tender/21502840/?fbclid=IwY2xjawN1hENleHRuA2FlbQIxMABicmlkETE5a3R2NzdkYURUOFN2RZp6AR439xktoV4c4_9wNNBZTnZF659uMipTjAb6dUlqX-ExPZks4hCBP3796QG6yw_aem_vGe9aanpIsbC4lDJFJkiMg">platform</a> achizitii.md.</p>

<p class="wp-block-paragraph">Previously, the AIC management <a href="https://ipn.md/en/the-terminal-of-chisinau-airport-will-be-expanded-by-5-thousand-square-meters/">announced</a> that the terminal will be expanded by 5,000 square meters, and the project is estimated at 700 million lei.</p>
<p>The post <a href="https://ipn.md/en/chisinau-airport-launches-the-tender-for-terminal-expansion/">Chisinau Airport launches the tender for terminal expansion</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The terminal of Chisinau Airport will be expanded by 5 thousand square meters</title>
		<link>https://ipn.md/en/the-terminal-of-chisinau-airport-will-be-expanded-by-5-thousand-square-meters/</link>
		
		<dc:creator><![CDATA[Iana Josu]]></dc:creator>
		<pubDate>Mon, 04 Aug 2025 11:25:03 +0000</pubDate>
				<category><![CDATA[Economy]]></category>
		<category><![CDATA[airport]]></category>
		<category><![CDATA[Expansion]]></category>
		<category><![CDATA[International Airport Chișinău]]></category>
		<category><![CDATA[Investments]]></category>
		<category><![CDATA[Modernization]]></category>
		<category><![CDATA[Terminal]]></category>
		<guid isPermaLink="false">https://ipn.md/the-terminal-of-chisinau-airport-will-be-expanded-by-5-thousand-square-meters/</guid>

					<description><![CDATA[<p>The passenger terminal of Chisinau International Airport, recently renamed &#8220;Eugen Doga&#8221;, will be expanded by 5,000 square meters, as part of a project estimated at 700 million lei. According to&#8230;</p>
<p>The post <a href="https://ipn.md/en/the-terminal-of-chisinau-airport-will-be-expanded-by-5-thousand-square-meters/">The terminal of Chisinau Airport will be expanded by 5 thousand square meters</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The passenger terminal of Chisinau International Airport, recently renamed &#8220;Eugen Doga&#8221;, will be expanded by 5,000 square meters, as part of a project estimated at 700 million lei. According to the airport administration, the works are expected to be completed by the end of 2026. The airport administration announced today that the tender for the selection of the construction company will be launched in the next two months, reports IPN.</p>

<p class="wp-block-paragraph">The investment will be fully covered by the company&#8217;s own revenues. The project aims to increase passenger processing capacity, reduce waiting times, and align airport infrastructure with international standards. The technical project is developed by the Office for Territorial Planning, Urbanism, Construction, and Housing.</p>

<p class="wp-block-paragraph">&#8220;This ambitious project marks the beginning of a new era for our airport. We aim to reduce waiting time, increase comfort, and transform the Eugen Doga International Airport &#8211; Chisinau into a modern and efficient air hub, of which all citizens can be proud,&#8221; stated the interim director of the terminal, Sergiu Spoială, at a press conference.</p>

<p class="wp-block-paragraph">The project envisages the expansion of control areas and waiting spaces, the installation of automatic gates for passport control, as well as the introduction of the Fast Track system, designed to accelerate passenger flow. Self-service solutions for luggage drop-off will also be implemented. In addition, the arrangement of a covered terrace is planned, and the departure area will be doubled in height by creating a mezzanine, to provide a more airy and functional interior space.</p>

<p class="wp-block-paragraph">The Deputy Director of the Public Property Agency, Valerian Bobu, mentioned that the development of infrastructure is possible due to the financial performance of the state enterprise. According to him, the revenues of the Chisinau International Airport have significantly increased: from 2.6 million lei in 2022 to 211 million in 2023. For the year 2024, the estimates rise to 337 million lei.</p>

<p class="wp-block-paragraph">The Director of the Office for Territorial Planning, Nicolae Lupusor, specified that the works will be carried out in stages, so that the airport&#8217;s activity is not affected. &#8220;Our technical vision focuses on creating a fluid, intuitive space adapted to future needs,&#8221; he said.</p>
<p>The post <a href="https://ipn.md/en/the-terminal-of-chisinau-airport-will-be-expanded-by-5-thousand-square-meters/">The terminal of Chisinau Airport will be expanded by 5 thousand square meters</a> appeared first on <a href="https://ipn.md/en/">ipn.md</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
