Supply of hot water in Chisinau resumed

The supply of hot water in the municipality of Chisinau will be resumed tomorrow, August 5, the representative of the public utility SA “Termocom” Iurie Razlovan announced Monday, IPN reports.

Iurie Razlovan said the water pipes have been 95% filled with water and about 1,500 apartment buildings will be connected to the hot water supply tomorrow. Another 100 buildings will be connected later as some of the water pipes are still under repair.

The supply of hot water through the centralized system was stopped on July 6 owing to the cleaning and repair works launched by the thermoelectric plant SA “CET-2”.

Вы используете модуль ADS Blocker .
IPN поддерживается от рекламы.
Поддержи свободную прессу!
Некоторые функции могут быть заблокированы, отключите модуль ADS Blocker .
Спасибо за понимание!
Команда IPN.