logo

Most of water networks in Chisinau ready for cold season


https://www.ipn.md/index.php/en/most-of-water-networks-in-chisinau-ready-for-cold-season-7967_1007544.html

The Chisinau water supplier prepared most of the water and sewerage networks for winter. The technical and production director of SA Apa-Canal Chisinau Vitalie Midari Monday said the works continue on several streets in Buiucani and Botanica districts. They also continue to replace the pipes within the projects to lay out the streets C. Negruzzi and V. Alecsandri and Stefan cel Mare Blvd., IPN reports.

The supply of water is off while the water networks are washed and cleaned. Works are executed on the sewer pipe going along V. Alecsandri St, at the intersection of Bucuresti St, and on the 300 mm diameter water pipe going along Stefan cel Mare Blvd., at the intersection of C. Negruzzi St.

According to Vitalie Midari, in the middle of September a water pipe will start to be laid in the lower part of Alecsandri St, between Stefan cel Mare Blvd. and Varlaam St.