Two apartment buildings in the municipality of Chisinau were connected to the heating system, as were 117 kindergartens, 9 schools and 11 medical institutions, the head of the General Housing and Amenities Division Ion Burdiumov announced in the ordinary meeting of officials of municipal services, IPN reports.
The residential blocks and institutions are connected to the heating system on request.
“Prophylaxis works in the engineering systems were carried out in all residential blocks in summer. Also, hydropneumatic washing works and hydraulic control were performed. By this moment, all the technical passports were signed. In the case of apartment buildings managed by homeowners’ associations, about 71% of them are ready for the heating season,” said Ion Burdiumov.
The 2024-2025 heating season for consumers in Chisinau municipality began on October 17, following a relevant order signed by deputy mayor of Chisinau Irina Gutnic.