logo

Repairs on water pipe on Diordita St close to an end


https://www.ipn.md/en/repairs-on-water-pipe-on-diordita-st-close-to-an-end-7967_1005996.html

The works to renovate the water pipe going through Diordita St are close to completion. The Chisinau water utility informed that the pipe will be put into operation on June 20, IPN reports.

According to the technical production director of SA Apa-Canal Chisinau Vitalie Midari, works were carried out in parallel to design the sewerage system. After the works on the heat pipes are over, the sewer pipes will start to be laid. The works will last until July. The costs that the water supplier will incur have not been determined yet.