logo

Housing and Amenities Division prepares Chisinau housing stock for winter season


https://www.ipn.md/en/housing-and-amenities-division-prepares-chisinau-housing-stock-for-winter-7967_1099878.html

Works to clean the engineering systems at the beginning of October were performed in the proportion of 100% at 23 municipal enterprises. At dwellers’ associations, the percentage is lower, of 65.3%, for the reason that these do not have own technical equipment for such works and have to rent the equipment, said Ion Burdiumov, the head of the General Housing and Amenities Division of the Chisinau Municipal Council.

As regards the hydro-pneumatic washing of the systems, the given works at municipal enterprises were executed in the proportion of 99.7%, while at dwellers’ associations – of 48.8%. As regards hydraulic control, the enterprises carried out the works in the proportion of 94.7%, while dwellers’ associations – of 48.8%. The water analysis was conducted at enterprises in the proportion of 91.8%, while at dwellers’ associations – of 48.8%.

Some 50.7% of the housing sector managing enterprises on October 2 signed technical passports. The figure in the case of dwellers’ associations is of only 0.8%.

Ion Burdiumov noted that the General Housing and Amenities Division will further monitor the preparations for the winter season at the municipal enterprises and at dwellers’ associations. If need be, the Division will intervene to solve the emerging problems.

In the municipality of Chisinau, there are 1,487 apartment buildings managed by municipal enterprises (1-23) and 1,216 apartment buildings managed by dwellers’ associations, which are connected to the centralized heating system.