logo

Bridge in Sangera to be closed for 3 days


https://www.ipn.md/en/bridge-in-sangera-to-be-closed-for-3-days-7967_961307.html

The bridge from Sangera town, included in the composition of the municipality of Chisinau will be closed for 3 days in light of some prophylactic works. According to Chisinau’s Roadway Police, during Septemebr 21-23, 2006, circulation will be redirected on other streets from Sangera town. The deputy head of the General Department for Public Transport, Alexei Varlan told Info-Prim Neo that the bridge is not undergoing reparations and it is all about a prophylaxis planned one year ago, when it was put into operation. Then, the constructors took the engagement to verify how the new technologies used at the construction of the European standard bridge are working, the cited source said. The vehicles which will cross through Sangera town during September 21-23 will be redirected on other roadways.